Joseph Priestley Building Huddersfield University

Joseph Priestley Building

Huddersfield University

Project: Joseph Priestley Building Huddersfield University

Sector: Education  

Type: Traditional

Value: £2.5M

K2 divisions: M&E

K2 were contracted for a full MEP package for the refurbishment and new build elements for this building. K2 developed the strategy and concept designs in close collaboration with the project management team to develop the facility capable of meeting the needs of the next generation of students.

K2 were appointed as mechanical and electrical Engineering consultants to provide full co-ordinated detailed design and working drawings for the Main Contractor. The project was completed on time and budget, and exceeding all of the clients requirements.

Work undertaken:

Enabling works – voice data/fire alarm/power | Ducted ventilation including heat recovery units | Electrical distribution | Roof mounted air conditioning condenser units | Dali compatible lighting scheme | Low temperature hot water heating system | Data/voice systems | Domestics to toilet and kitchen installations | Dado trunking for small power, data and audio visual systems | Full BMS system